An available terminal with a size of a small hectare is directly connected with the berth.
New Ro-Ro berth operational in the port of Oostende
This story is available in full to Ferrynews subscribers only. Become a subscriber to see more.
At the end of November 2007 the port of Oostende will inaugurate a new berth for loading and unloading RoRo
ships. It is a double deck berth which makes it possible to load or unload the ships above and below simultaneously.
An available terminal with a size of a small hectare is directly connected with the berth.
An available terminal with a size of a small hectare is directly connected with the berth.
This story is available in full to Ferrynews subscribers only. Become a subscriber to see more.

Mon 26 Nov, 2007
| Posted in: